Poseidonoffshoreenergy

Specialist Offshore & Marine Engineering

Practical engineering support for contractors, vessel owners and project teams from design through mobilisation and offshore execution.

Poseidon Offshore Energy engineers reviewing an offshore project on a laptop
About Poseidon Offshore Energy

Focused Engineering Support for Offshore Projects

Welcome to Poseidon Offshore Energy, an independent offshore and marine engineering and project management consultancy supporting Oil & Gas, Offshore Renewables and marine projects.

We provide practical, project-focused engineering support that bridges the gap between design development, mobilisation and offshore execution.

Our Capabilities

Specialist Offshore Engineering Capabilities

Engineering-led planning, coordination and execution follow-up, including Primavera P6 scheduling, interface control, vendor follow-up and mobilisation readiness.
01
Load-out, sea-fastening and grillage design, lift and rigging studies, installation procedures, mobilisation engineering and marine operations support.
02
FEA, strength and fatigue checks, temporary works, padeyes and lifting frames, modification checks and fabrication-ready design packages.
03
Cable lay, pull-in, burial and repair engineering, supported by dynamic analysis, vessel motions and workability assessment.
04
Stability and loading conditions, seakeeping and marine transport studies, class-related support and vessel modifications.
05
Piping layouts and isometrics, P&IDs and datasheets, instrumentation, control and SIS/ESD support for offshore facilities and brownfield scopes.
06
2D/3D modelling, fabrication and installation drawings, and design documentation supporting each engineering discipline.
07
Why Poseidon

Direct, Practical and Responsive Engineering Support

01

Direct Engineer Contact

Clients deal directly with the engineers responsible for the assignment, from scope definition through to final deliverables.
02

Project-Specific Expertise

Each assignment is resourced according to its technical scope, the disciplines involved and the deliverables required.
03

Clearly Defined Scope

Inputs, assumptions, interfaces, responsibilities and exclusions are agreed before the main engineering work begins.
04

Responsive to Project Change

We respond to technical developments, review comments and changing project priorities, while maintaining clear communication on scope, schedule and deliverables.
05

Practical Deliverables

Calculations, drawings and reports are prepared for direct use in design, fabrication, mobilisation and offshore execution.
How We Work

How We Support Your Project

01
Understand the Requirements

Review the project objectives, technical requirements, available information, applicable standards and target schedule.

02
Define the Engineering Scope

Establish the scope of work, engineering inputs, assumptions, interfaces, deliverables, exclusions and agreed schedule.

03
Execute the Engineering

Perform the required engineering analyses, design and drafting, with appropriate technical verification and quality checks before submission.

04
Review and Finalise

Address client and relevant third-party review comments, incorporating agreed revisions and issuing the final deliverables.

05
Support Project Execution

Provide engineering support during procurement, fabrication, installation and offshore execution, where included in the agreed scope.

Have a Question?

Get in touch with our engineering team to discuss your next offshore project.