Services
Engineering Excellence Across Every Discipline
Poseidon Offshore Energy provides focused engineering support for offshore contractors, vessel owners and project teams across Europe.
Our services cover transportation and installation engineering, structural analysis and detailed design, cable installation engineering, hydrodynamic and operability analysis, naval architecture, vessel modifications, electrical and instrumentation engineering, and process, piping and layout design.
Support can be provided for feasibility studies, concept development, FEED, detailed design, independent technical reviews, mobilisation engineering and offshore execution preparation. The scope, inputs, assumptions, interfaces and deliverables are agreed according to the requirements of each assignment.
Need Specialist Offshore Engineering Support?
Discuss your project requirements, available technical information and target schedule with Poseidon Offshore Energy.