Transportation & Installation Engineering

T&I Engineering from Loadout to Offshore Installation

Poseidon Offshore Energy provides transportation and installation engineering for offshore structures, subsea assets and project equipment, from loadout through marine transport, lifting and offshore installation. We deliver the engineering that shows, before mobilisation, that your cargo can be loaded out, seafastened, transported, lifted and installed within the vessel, structural and operational limits.

T&I Engineering Services
01

Loadout and Transport Configurations

Cargo arrangement and loadout engineering from quay or yard to the transport vessel or barge.

02

Deck Layouts

Cargo, equipment and support layouts coordinated with deck capacity.

03

Seafastening and Grillage Design

Grillages and seafastening that carry transport loads safely into the vessel structure.

04

Lift Plans and Rigging Studies

Lifting arrangements, rigging configuration and lift planning, including padeye and crane-interface checks.

05

Installation Procedures

Method statements, procedures and sequence drawings for offshore execution.

06

Mobilisation and Marine Operations Support

Marine-spread interface reviews and engineering support through mobilisation and execution.

Structures, Operations and Deliverables

Structures and Operations We Support

We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects, including:

  • Loadout of offshore structures and project equipment
  • Marine transport on vessels and barges
  • Quayside and offshore lifts
  • Offshore installation of structures, subsea assets and equipment
  • Vessel mobilisation for installation campaigns

Deliverables

  • Loadout and transport configuration drawings
  • Deck layout drawings
  • Seafastening and grillage designs
  • Lift plans and rigging studies
  • Installation method statements, procedures and sequence drawings

All work is carried out to the applicable international standards, marine warranty requirements where applicable, and your project specifications.

Why Poseidon

Direct, Practical T&I Engineering Support

01

Direct Engineer Contact

You work with the engineers responsible for the assignment, from scope to final deliverable.
02

Clearly Defined Scope

Inputs, assumptions, interfaces and exclusions are agreed before the main work starts.
03

Practical Operational Insight

Engineering decisions informed by practical understanding of vessel operations, fabrication, mobilisation and offshore installation.
04

Practical Deliverables

Drawings, procedures and calculations prepared for direct use in mobilisation and offshore execution.
Frequently Asked Questions
What does T&I engineering cover?

The engineering that confirms a cargo can be loaded out, seafastened, transported, lifted and installed safely: configurations, deck layouts, seafastening and grillage, lift and rigging studies, and installation procedures.

Cargo weight and centre of gravity, support points, the transport vessel or barge, the transport criteria, and any marine warranty requirements.

Yes, together with our Structural Analysis & Design service.

Discuss Your Project

Planning a loadout, transport or offshore lift? Send us the cargo data, vessel information and schedule, and our Engineering Team will come back with a defined T&I scope.