Naval Architecture & Marine Engineering
Naval Architecture for Vessel Suitability, Modification and Offshore Operations
Poseidon Offshore Energy provides naval architecture and marine engineering for vessel suitability, modification and offshore operations. We assess stability, loading conditions, weight and deck capacity so you know, before mobilisation, that the vessel can safely carry out the planned scope.
Intact and Damage Stability
Stability assessments for operational, transport and modified vessel conditions.
Loading Conditions
Loading conditions for cargo, ballast and operational stages, checked against vessel limits.
Weight and Centre-of-Gravity Control
Weight and CoG tracking through design and modification, so changes are understood early.
Deck-Capacity Reviews
Reviews of deck capacity for cargo, equipment and temporary installations.
Seakeeping and Marine Transport Studies
Vessel motion and seakeeping studies supporting marine transport and offshore operations.
Vessel Modifications and Class Support
General arrangement development, watertight integrity and freeboard considerations, marine-system interfaces and class-related support.
Vessels and Operations We Support
We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects, including:
- Transport vessels and barges
- Vessel modifications and equipment additions
- Marine transport of heavy and project cargo
- Offshore operations that need stability and deck-capacity confirmation
Deliverables
- Stability and loading-condition calculations
- Weight and centre-of-gravity reports
- Deck-capacity assessments
- General arrangement drawings for modifications
- Supporting documentation for class-related review
All work is carried out to the applicable international standards, class requirements and your project specifications.
Direct, Practical Marine Engineering Support
Direct Engineer Contact
Clearly Defined Scope
Coordinated with Structural and T&I
Practical Deliverables
Before a vessel is committed to a new cargo, modification or offshore operation, to confirm stability, deck capacity and operational limits.
The vessel stability information and lightship data, the planned cargo or modification with weights and centres of gravity, and the operating conditions.
Yes. We provide the engineering and documentation needed for class-related review of vessel modifications.
Discuss Your Project
Planning a vessel modification or a new offshore operation? Send us the vessel information and planned scope, and our Engineering Team will come back with a defined scope.