Process, Piping & E&I Engineering

Process, Piping and E&I Engineering for Offshore Facilities and Modifications

Poseidon Offshore Energy provides process, piping, electrical, instrumentation and control engineering for offshore facilities, vessel modifications, brownfield scopes and temporary project systems, from P&ID development and equipment specifications to electrical load lists, cable sizing and routing. We deliver coordinated engineering so modifications can be fabricated, installed and commissioned with fewer interface issues.

Process, Piping & E&I Services
01

Process Engineering

P&ID development and review, process inputs and datasheets for new and modified systems.

02

Equipment Specifications

Equipment specifications and datasheets, with review of vendor documentation.

03

Piping Design

Piping design basis and specifications, line and tie-in lists, layouts and 3D modelling.

04

Electrical Engineering

Electrical load lists, cable sizing and cable routing for offshore facilities and vessel systems.

05

Instrumentation and Control

Field instrumentation and control philosophies, with loop diagrams and I/O lists.

06

Safety Systems and Commissioning Support

SIS/ESD and cause-and-effect support, and engineering input to commissioning.

Facilities, Scopes and Deliverables

Facilities and Scopes We Support

We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects, including:

  • Offshore facilities
  • Brownfield modifications and tie-ins
  • Vessel modifications
  • Temporary project systems

Deliverables

  • P&IDs
  • Equipment specifications and datasheets
  • Isometrics and material take-offs
  • Electrical load lists and cable sizing calculations
  • Cable routing layouts and cable schedules
  • Loop diagrams and I/O lists

All work is carried out to the applicable international standards and your project specifications.

Why Poseidon

Direct, Practical Multi-Discipline Support

01

Direct Engineer Contact

You work with the engineers responsible for the assignment, from scope to final deliverable.
02

Clearly Defined Scope

Inputs, assumptions, interfaces and exclusions are agreed before the main work starts.
03

Coordinated Disciplines

Process, piping and E&I engineering coordinated with structural and marine scopes.
04

Practical Deliverables

Documentation prepared for direct use in fabrication, installation and commissioning.
Frequently Asked Questions
Do you support brownfield modifications?

Yes. Brownfield scopes, tie-ins and modifications to existing facilities are a core part of this service.

Existing P&IDs and layouts, the modification scope, process and equipment data, and any available site survey information.

Yes, together with our Structural Analysis & Design service.

Discuss Your Project

Planning an offshore modification or tie-in? Send us the existing documentation and modification scope, and our Engineering Team will come back with a defined scope.