Offshore Drafting & Design Support

Drafting and 3D Modelling for Offshore Engineering Scopes

Poseidon Offshore Energy provides drafting and design support for structural, marine, piping and installation scopes, working to the engineering of the responsible discipline. We produce clear drawings and models that fabrication yards and offshore teams can work from.

Drafting & Design Services
01

2D Drafting

Drawings prepared to the engineering of the responsible discipline.

02

3D Modelling

3D models supporting layout development, interface checks and drawing production.

03

Fabrication Drawings

Fabrication and detail drawings prepared for yard use.

04

Installation and Deck-Layout Drawings

Installation drawings and deck layouts for transport and offshore operations.

05

General Arrangement Drawings

General arrangement drawings for structures, equipment and modifications.

06

Drawing Control and As-Built Updates

Drawing registers, material take-offs and as-built updates.

Disciplines and Deliverables

Disciplines We Support

We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects across:

  • Structural scopes
  • Marine and vessel modification scopes
  • Piping scopes
  • Transportation and installation scopes

Deliverables

  • Fabrication and installation drawings
  • General arrangement and detail drawings
  • Deck-layout drawings
  • Material take-offs
  • Drawing registers and as-built updates

All drawings are prepared to the applicable international standards and your project drafting requirements.

Why Poseidon

Direct, Practical Design Support

01

Direct Engineer Contact

You work with the engineers responsible for the assignment, from scope to final deliverable.
02

Clearly Defined Scope

Inputs, assumptions, interfaces and exclusions are agreed before the main work starts.
03

Engineering-Led Drafting

Drawings prepared alongside the responsible engineers, so design intent is carried through.
04

Practical Deliverables

Drawings and models prepared for direct use in fabrication and offshore execution.
Frequently Asked Questions
Which drawing requirements do you work to?

Your project drafting requirements, agreed at the start of the assignment, together with the applicable international standards.

Yes. As-built updates of existing drawings are part of this service.

Drafting works to the engineering of the responsible discipline, so drawings reflect the verified design.

Discuss Your Project

Need drawings or models for an offshore scope? Send us the engineering inputs and drawing requirements, and our Engineering Team will come back with a defined scope.