Offshore Drafting & Design Support
Drafting and 3D Modelling for Offshore Engineering Scopes
Poseidon Offshore Energy provides drafting and design support for structural, marine, piping and installation scopes, working to the engineering of the responsible discipline. We produce clear drawings and models that fabrication yards and offshore teams can work from.
2D Drafting
Drawings prepared to the engineering of the responsible discipline.
3D Modelling
3D models supporting layout development, interface checks and drawing production.
Fabrication Drawings
Fabrication and detail drawings prepared for yard use.
Installation and Deck-Layout Drawings
Installation drawings and deck layouts for transport and offshore operations.
General Arrangement Drawings
General arrangement drawings for structures, equipment and modifications.
Drawing Control and As-Built Updates
Drawing registers, material take-offs and as-built updates.
Disciplines We Support
We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects across:
- Structural scopes
- Marine and vessel modification scopes
- Piping scopes
- Transportation and installation scopes
Deliverables
- Fabrication and installation drawings
- General arrangement and detail drawings
- Deck-layout drawings
- Material take-offs
- Drawing registers and as-built updates
All drawings are prepared to the applicable international standards and your project drafting requirements.
Direct, Practical Design Support
Direct Engineer Contact
Clearly Defined Scope
Engineering-Led Drafting
Practical Deliverables
Your project drafting requirements, agreed at the start of the assignment, together with the applicable international standards.
Yes. As-built updates of existing drawings are part of this service.
Drafting works to the engineering of the responsible discipline, so drawings reflect the verified design.
Discuss Your Project
Need drawings or models for an offshore scope? Send us the engineering inputs and drawing requirements, and our Engineering Team will come back with a defined scope.