Structural Analysis & Design

Structural Engineering for Offshore and Marine Projects

Poseidon Offshore Energy provides structural analysis and detailed design for offshore structures, vessel modifications, equipment foundations and temporary works. We turn loads, drawings and project constraints into verified calculations and fabrication-ready designs, so your structure, modification or temporary works can move to fabrication and installation with confidence.

Structural Engineering Services
01

Global and Local Structural Analysis

Load paths, member forces and local checks for offshore structures and their components.

02

Finite Element Analysis (FEA)

Detailed models where geometry, stress concentrations or load spreading need more than hand calculations.

03

Strength and Fatigue Assessment

Capacity and fatigue checks of members, connections and details.

04

Deck Loading and Brownfield Modification Checks

Verification of existing structures for new equipment, temporary loads and modifications, with reinforcement design where needed.

05

Lifting Frames, Padeyes and Support Structures

Design and verification of lifting points, frames, equipment supports and temporary works.

06

Design Verification

Independent review of structural designs and calculations.

Structures, Operations and Deliverables

Structures and Operations We Support

We support Offshore Wind & Renewables, Oil & Gas, Subsea Infrastructure and Marine & Offshore Infrastructure projects, including:

  • Offshore structures and their modification
  • Vessel decks and vessel modifications
  • Equipment foundations and supports
  • Temporary works for fabrication, loadout, transport and installation
  • Lifting frames, padeyes and lifted items

Deliverables

  • Calculation reports
  • Fabrication drawings
  • Material take-offs
  • Fabrication-ready design packages

All work is carried out to the applicable international standards and your project specifications and requirements.

Why Poseidon

Direct, Practical Structural Engineering Support

01

Direct Engineer Contact

You work with the engineers responsible for the assignment, from scope to final deliverable.
02

Clearly Defined Scope

Inputs, assumptions, interfaces and exclusions are agreed before the main work starts.
03

Responsive to Change

Review comments and changing priorities are handled with clear communication on scope and schedule.
04

Practical Deliverables

Calculations and drawings prepared for direct use in fabrication, mobilisation and offshore execution.
Frequently Asked Questions
What do you need to start a structural analysis?
Drawings or a model of the structure, the loads to be assessed, the applicable standards or client specification, and the required deliverables.
When geometry, local stresses or load spreading are too complex for reliable hand calculations, for example plated decks, openings or padeye connections.
Yes, including reinforcement design where the existing capacity is insufficient.

Discuss Your Project

Have a structural scope to discuss? Send us your drawings, loads and schedule, and our Engineering Team will come back with a defined scope.